Ashtrom Group The main bridge in the Jerusalem Highway 22 project is a complex engineering structure approximately 230 meters long and 40 meters high, spanning the
Scopus (Tzofim) stream. The use of a Potain H30-30 tower crane in bridge construction offers advantages in terms of lifting precision and continuous coverage over time. This enables the placement of heavy elements such as precast beams, formwork, rebar, and bridge sections with maximum precision and less dependence on complex adjustments on site.