In the Bridge 22 project in Jerusalem, we supplied a tower crane that was precisely suited to the site’s operational needs. Since the bridge work did not involve lifting unusually heavy loads, but did require a large number of lifts of equipment, materials, and tools throughout the different stages of the work and around the bridge perimeter, choosing a tower crane was an especially efficient solution. The use of the crane provided wide working coverage, high availability for repeated lifts, and significant savings in time and costs compared to alternative lifting solutions.