Azrieli Sarona Tower
The challenge of dismantling a tower crane that reached 260 m was solved by using DERRICK cranes. The Derrick cranes are mainly used to dismantle tower cranes from great heights, quickly and safely and eventually are dismantled and lowered using the building’s elevator

City:
Tel Aviv

Contractor:
EL-HAR Engineering & Construction

Developer:
Azrieli group
Crane types:
DERRICK crane WG-18 by YONGMAO and a DERRICK crane CDK 83-12

































